2012 EMBRAER LEGACY 650
HIGHLIGHTS – 13 Passenger Configuration – One Owner Since New – Airframe & APU on Embraer Executive Care Enhanced – Engines on Rolls Royce Corporate Care – EASA Certified – ADS-B Out / FANS-1/A / CPDLC – Swift Broadband Internet – Forward Crew Lavatory
AIRFRAME Certificate of Airworthiness: 19th November 2012 Entry Into Service: 22nd November 2012 Certification: EASA Total Time Since New: 5,008 Hours Total Landings Since New: 1,769 (as of 09th November 2023) Program Coverage: Enrolled on Embraer Executive Care Enhanced Maintenance Tracking: CAMP
ENGINES Manufacturer: Rolls Royce Model: AE 3007A2 ENGINE 1 (LEFT) ENGINE 2 (RIGHT) Serial Number: CAE313302 CAE313303 Total Time Since New: 5,008 Hours 5,008 Hours Total Cycles Since New: 1,769 1,769 Program Coverage: Enrolled on Rolls Royce Corporate Care
APU Manufacturer: Pratt & Whitney Model: T-62T-40C14 Serial Number: SP-E1228138 Total Time Since New: 4,498 Hours Total Cycles Since New: 4,444 Program Coverage: Enrolled on Embraer Executive Care Enhanced
AVIONICS – Five 8” x 7” Liquid Crystal Display (LCD) – 2 Primary Flight Displays (PFD) – 2 Multifunction Displays (MFD) – 1 Engine Indication and Crew Alerting System (EICAS) – Dual Integrated Avionics Computers (IAC) – Dual Radio Management Units (RMU) – Dual VHF Communication System with 8.33 KHz Frequency Spacing comprising Mode S Diversity Transponder – Dual VHF Navigation System (Integrated NAV, ADF and DME functions) – Cabin Interphone Systems – Airborne Audio System – Solid State Cockpit Voice Recorder (SSCVR) – Solid State Flight Data Recorder (SSFDR) Aural Warning Unit (AWU) – Dual Digital Clocks – Coupled VNAV – RNP 0.3 capability
– Dual RVSM compatible Air Data Computers (ADC) – Integrated Standby Instruments System (ISIS) – Dual Inertial Reference System (IRS) – Radio Altimeter (RA) – EGPWS with windshear detector and escape guidance – Weather Radar with Dual Control Panel and Turbulence Detection – Traffic Alert and Collision Avoidance System (TCAS) – Dual Flight Management Systems (FMS) + Global Positioning Systems (GPS) – Data Loader DL-1000 – CAT II Autopilot/Flight Director (FD) – Central Maintenance Computer (CMC) – Dual Stall Protection System (SPS) – HF Radio – SELCAL – Emergency Locator Transmitter (ELT)
INTERIOR – Thirteen (13) Passenger Configuration – Forward Galley with High Temp Oven, Microwave Oven, Espresso Maker, Chiller Area and Ice Drawer – Forward Cabin Four (4) Club Seats – Mid Cabin Four (4) Place Conference Group opposite Credenza – Aft Cabin Two (2) Club Seats opposite Three (3) Place Divan – Swift Broadband Internet – Forward & Aft Lavatories
MAINTENANCE INSPECTION LAST PERFORMED NEXT DUE 12 Month August 2023 August 2024 24 Month August 2022 August 2024 48 Month January 2021 November 2024 72 Month November 2018 November 2024 96 Month January 2021 November 2028 144 Month – November 2024
版权说明:
1,全面、新鲜的航材资讯及交易概况发布
2,图片及内容涉及侵权,联系微信
3,转载或者引用本文内容请注明来源及原作者;
4,专注二手波音、空客、二手航材等相关领域